will be the world record in the year 2023 with a main span of 2023 m. The special is back tension cables ware attached at the bridge begin to stabilize main cables. The different soil conditions needed to be considered in the soil-structure interaction seismic action.

The main design was done by COWI. The Independent Design Verification was conducted by a group of Aas Jakobsen and ARUP. We have provided a finite element analysis of the bridge together.